Riverside Drive - Phase 2

Project Type:Construction Projects
Project Subtype:Major Projects

We’re raising the road to increase future flood resilience along Riverside Drive and replacing water, sanitary and storm sewer infrastructure in the area. This is the second phase of a major infrastructure renewal project that began in 2023.

What to expect:

  • A full closure of Riverside Drive from Sumac to Corbett Avenue to through traffic for the duration of construction.
  • Sumac Street intersection will remain open, and traffic detoured around Sumac Street, Colwell Drive, Carmen Avenue and Watters Drive.

The benefits:

  • Raising the road will keep the roadway open longer – and reopen sooner – during major flooding events.
  • Renewed piping will benefit the quality and reliability of water and sewer services in the area.